[Subscribe to Daily Digest] |
Two of my favorites: PO ran wiring along the top of the baseboards and the edge of the door and window moldings. Then they covered it with drywall mud and painted over it. PO had central air powered by tapping into the wire ahead of the meter and used the plumbing as the neutral.
No Site Registration is Required to Post - Site Membership is optional (Member Features List), but helps to keep the site online
for all Saabers. If the site helps you, please consider helping the site by becoming a member.