The banner above is an advertisment - if it asks you to download software, please ignore.
Site News - 4/9 Saab Owners' Convention Day Pass Raffle | 3/26 M Car Covers (by State of Nine)

Overview

Getting Started

Project Outline

Parts Checklist

Preparation

Engine Removal

Transmission Swap

 

 

 

 

Preparation

The following is strongly recommended:

  • A package of large plastic zip-lock type bags with labels for organizing parts. Available in most supermarkets.
  • Plastic adhesive backed labels for marking hoses and wires with numbers.
  • An assortment of cardboard boxes for storing various parts.
  • A notebook or clipboard for recording specific operations or drawing diagrams.
  • A still or video camera for photographing parts of the engine before disassembly, this will help immensely during the installation phase.

Other items:

  • Shop rags
  • Engine degreaser/cleaner
  • Threadlock for bolts.
  • General purpose and bearing grease